Language

Compare models

2 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Legamaster SUP-6500 €110.40
  • Ernitec 0070-24165 €55.32
Model Legamaster SUP-6500 Ernitec 0070-24165
Running cost
Running cost (per year) €110.40 €55.32
over 10 years €1,104 +€551 over 10 years €553
kWh per year 390 195
kg CO₂e per year from electricity use 82 41
Specifications
Brand Legamaster Ernitec
Model SUP-6500 0070-24165
Energy class D E
Screen size 65″ (165 cm) 65″ (165.1 cm)
Power in on mode (SDR) 178 W 89.2 W
Energy class (HDR) D E
Power in on mode (HDR) 178 W 89.2 W
Standby 0.5 W 0.4 W
Networked standby 0.5 W 0.4 W
Off mode 0 W 0.1 W
Resolution 3840 × 2160 3840 × 2160
Aspect ratio 16:9 16:9
Panel LED LCD LED LCD
Refresh rate 60 Hz 60 Hz
Power supply Internal Internal
On the market since May 3, 2021 September 30, 2024
EPREL registration number 557949 2120294
Guaranteed support – 1 year
Software updates – 7 years
Spare parts available – 6 years

Rows where the models differ are highlighted.