Language

Compare models

2 monitors side by side.

6 h a day
  • Electricity at €0.2896 per kWh (household price with taxes, Eurostat 2025-S2).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Legamaster EVP-7501 €74.20
  • Ernitec 0070-24175 €65.07
Model Legamaster EVP-7501 Ernitec 0070-24175
Running cost
Running cost (per year) €74.20 €65.07
over 10 years €742 +€91 over 10 years €651
kWh per year 256 225
kg CO₂e per year from electricity use 54 47
Specifications
Brand Legamaster Ernitec
Model EVP-7501 0070-24175
Energy class C E
Screen size 75″ (190 cm) 75″ (190.5 cm)
Power in on mode (SDR) 117 W 102.6 W
Standby 0.5 W 0.4 W
Networked standby 0.5 W 0.4 W
Off mode 0 W 0.1 W
Resolution 3840 × 2160 3840 × 2160
Aspect ratio 16:9 16:9
Panel LED LCD LED LCD
Refresh rate 60 Hz 60 Hz
Power supply Internal Internal
Guaranteed support 5 years 1 year
Software updates 2 years 7 years
Spare parts available 3 years 6 years
On the market since July 1, 2026 February 5, 2024
EAN 8713797114158 –
EPREL registration number 2869202 1901450
Energy class (HDR) – F
Power in on mode (HDR) – 102.6 W

Rows where the models differ are highlighted.