Language

Compare models

3 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Shenzhen Test Display CX174-A €4.34
  • Kodak WF173V €2.48
  • Vchance CF17 €2.79
Model Shenzhen Test Display CX174-A Kodak WF173V Vchance CF17
Running cost
Running cost (per year) €4.34 €2.48 €2.79
over 10 years €43 +€19 over 10 years €25 €28 +€3 over 10 years
kWh per year 15.3 8.8 9.9
kg CO₂e per year from electricity use 3.2 1.8 2.1
Specifications
Brand Shenzhen Test Display Kodak Vchance
Model CX174-A WF173V CF17
Energy class A B A
Screen size 17″ (34.1 cm) 17″ (43 cm) 17″ (43.9 cm)
Power in on mode (SDR) 7 W 4 W 4.5 W
Energy class (HDR) D – A
Power in on mode (HDR) 13 W – 4.6 W
Standby 2.5 W 0.5 W 0.2 W
Networked standby 0 W 0 W –
Off mode 0.3 W 0.3 W 0 W
Resolution 1920 × 1080 1920 × 1080 1920 × 1080
Aspect ratio 16:9 16:9 16:9
Panel LED LCD LCD TFT-LCD
Refresh rate 60 Hz 60 Hz 60 Hz
Power supply Internal External Internal
Guaranteed support 3 years 5 years –
Software updates 5 years 3 years –
Spare parts available 3 years 2 years –
On the market since January 23, 2026 August 13, 2026 September 4, 2024
EPREL registration number 2610081 2820382 2123256

Rows where the models differ are highlighted.