Language

Compare models

3 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • BCS BCS-MLED43FHD €26.05
  • UNV MW3243-V2 €17.49
  • UNV MT-43-C €23.57
Model BCS BCS-MLED43FHD UNV MW3243-V2 UNV MT-43-C
Running cost
Running cost (per year) €26.05 €17.49 €23.57
over 10 years €260 +€86 over 10 years €175 €236 +€61 over 10 years
kWh per year 92 61.8 83.2
kg CO₂e per year from electricity use 19 13 17
Specifications
Brand BCS UNV UNV
Model BCS-MLED43FHD MW3243-V2 MT-43-C
Energy class E D F
Screen size 43″ (108 cm) 43″ (108 cm) 43″ (109 cm)
Power in on mode (SDR) 42 W 28.2 W 38 W
Standby 0.5 W 0.3 W 0.2 W
Resolution 1920 × 1080 1920 × 1080 1920 × 1080
Aspect ratio 16:9 16:9 16:9
Panel LED LCD LCD LED LCD
Refresh rate 60 Hz 60 Hz 60 Hz
Power supply Internal Internal External
Guaranteed support 15 years 7 years 15 years
Software updates 8 years 8 years 8 years
Spare parts available 7 years 7 years 7 years
On the market since December 9, 2025 June 3, 2026 September 3, 2026
EPREL registration number 2580810 2745693 2838509
Networked standby – 0 W 0 W
Off mode – 0.3 W 0.2 W

Rows where the models differ are highlighted.