Language

Compare models

3 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Up Parts UP-MP-185WP €5.71
  • Upperizon UT185FHC €2.73
  • Caperave CF18 €3.04
Model Up Parts UP-MP-185WP Upperizon UT185FHC Caperave CF18
Running cost
Running cost (per year) €5.71 €2.73 €3.04
over 10 years €57 +€30 over 10 years €27 €30 +€3 over 10 years
kWh per year 20.1 9.6 10.7
kg CO₂e per year from electricity use 4.2 2 2.3
Specifications
Brand Up Parts Upperizon Caperave
Model UP-MP-185WP UT185FHC CF18
Energy class D A A
Screen size 18″ (46.9 cm) 18″ (47.1 cm) 18″ (46.9 cm)
Power in on mode (SDR) 9.2 W 4.4 W 4.9 W
Energy class (HDR) E – A
Power in on mode (HDR) 12 W – 5 W
Standby 0.2 W 0.4 W 0.2 W
Off mode 0.2 W 0 W 0.1 W
Resolution 1920 × 1080 1920 × 1080 1920 × 1080
Aspect ratio 16:9 16:9 16:9
Panel LED LCD LCD TFT-LCD
Refresh rate 60 Hz 100 Hz 60 Hz
Power supply STANDARD EXTERNAL External Internal
Guaranteed support 2 years – –
Software updates 2 years – –
Spare parts available 2 years – –
On the market since March 1, 2025 March 5, 2026 October 9, 2024
EAN 8052278835305 – –
EPREL registration number 2486291 2652604 2165575
Networked standby – 0 W –

Rows where the models differ are highlighted.