Language

Compare models

3 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Magedok M108C €3.10
  • Shenzhen Bolinia B105-SZF06L1 €1.61
  • Uperfect M105J01,M105001,M105002,M105003,M105004 €1.86
Model Magedok M108C Shenzhen Bolinia B105-SZF06L1 Uperfect M105J01,M105001,M105002,M105003,M105004
Running cost
Running cost (per year) €3.10 €1.61 €1.86
over 10 years €31 +€15 over 10 years €16 €19 +€2 over 10 years
kWh per year 11 5.7 6.6
kg CO₂e per year from electricity use 2.3 1.2 1.4
Specifications
Brand Magedok Shenzhen Bolinia Uperfect
Model M108C B105-SZF06L1 M105J01,M105001,M105002,M105003,M105004
Energy class A A A
Screen size 11″ (27.4 cm) 11″ (28.1 cm) 11″ (26.7 cm)
Power in on mode (SDR) 5 W 2.6 W 3 W
Energy class (HDR) A – –
Power in on mode (HDR) 7 W – –
Standby 0.8 W 0.3 W 0.5 W
Off mode 0.8 W 0.1 W 0.3 W
Resolution 1920 × 1080 1920 × 1080 1920 × 1080
Aspect ratio 16:9 3:2 16:9
Panel LED LCD LCD LCD
Refresh rate 60 Hz 60 Hz 60 Hz
Power supply Internal External External
Guaranteed support 3 years 1 year 1 year
Software updates 3 years 1 year 1 year
Spare parts available 3 years 1 year 1 year
On the market since May 13, 2025 November 4, 2024 July 17, 2026
EPREL registration number 2356683 2187164 2793131
Networked standby – – 0 W

Rows where the models differ are highlighted.