Language

Compare models

3 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • LC-Power LC-M49QCO €23.20
  • Rampage CY49RQ165 €19.23
  • Cepter C49ATILIUS2 €19.23
Model LC-Power LC-M49QCO Rampage CY49RQ165 Cepter C49ATILIUS2
Running cost
Running cost (per year) €23.20 €19.23 €19.23
over 10 years €232 +€40 over 10 years €192 €192
kWh per year 81.9 67.9 67.9
kg CO₂e per year from electricity use 17 14 14
Specifications
Brand LC-Power Rampage Cepter
Model LC-M49QCO CY49RQ165 C49ATILIUS2
Energy class F F E
Screen size 49″ (124.5 cm) 49″ (125 cm) 49″ (124 cm)
Power in on mode (SDR) 37.4 W 31 W 31 W
Energy class (HDR) G F E
Power in on mode (HDR) 63.4 W 31 W 31 W
Standby 0.3 W 0.3 W 0.3 W
Off mode 0.2 W 0.2 W 0.3 W
Resolution 5120 × 1440 5120 × 1440 5120 × 1440
Aspect ratio 32:9 32:9 32:9
Panel OLED LCD LED LCD
Refresh rate 60 Hz 165 Hz 120 Hz
Power supply Internal STANDARD EXTERNAL External
Guaranteed support 7 years 1 year 7 years
Software updates 8 years 1 year 7 years
Spare parts available 7 years 1 year 7 years
On the market since July 1, 2025 April 24, 2026 August 1, 2025
EAN 4262443281057 – –
EPREL registration number 2316261 2705937 2428327
Networked standby – – 0 W

Rows where the models differ are highlighted.