Language

Compare models

2 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • E-Tech S880 €4.96
  • Intehill T16PB €2.48
Model E-Tech S880 Intehill T16PB
Running cost
Running cost (per year) €4.96 €2.48
over 10 years €50 +€25 over 10 years €25
kWh per year 17.5 8.8
kg CO₂e per year from electricity use 3.7 1.8
Specifications
Brand E-Tech Intehill
Model S880 T16PB
Energy class C A
Screen size 16″ (41 cm) 16″ (40.6 cm)
Power in on mode (SDR) 8 W 4 W
Standby 0.5 W 0.5 W
Resolution 1920 × 1200 1920 × 1200
Aspect ratio 16:10 16:10
Panel LED LCD LCD
Refresh rate 60 Hz 120 Hz
Power supply Internal External
On the market since March 4, 2025 February 6, 2026
EPREL registration number 2279981 2624266
Networked standby – 0 W
Off mode – 0.3 W
Guaranteed support – 1 year
Software updates – 1 year
Spare parts available – 1 year

Rows where the models differ are highlighted.