Language

Compare models

2 monitors side by side.

6 h a day
  • Electricity at €0.2832 per kWh (household price with taxes, Eurostat 2026-S1).
  • 210 g CO₂e per kWh generated in 2023 (European Environment Agency). Counts use only, not manufacturing.

Yearly running cost

Bars in proportion to the energy each model uses.

  • Japannext JN-MD-IPS133FHDR-T €1.18
  • Vchance YF13T €2.11
Model Japannext JN-MD-IPS133FHDR-T Vchance YF13T
Running cost
Running cost (per year) €1.18 €2.11
over 10 years €12 €21 +€9 over 10 years
kWh per year 4.2 7.4
kg CO₂e per year from electricity use 0.9 1.6
Specifications
Brand Japannext Vchance
Model JN-MD-IPS133FHDR-T YF13T
Energy class E A
Screen size 13″ (33.7 cm) 13″ (33.7 cm)
Power in on mode (SDR) 1.9 W 3.4 W
Energy class (HDR) E A
Power in on mode (HDR) 6.1 W 3.5 W
Standby 0.2 W 0.2 W
Resolution 1920 × 1080 1920 × 1080
Aspect ratio 16:9 16:9
Panel LED LCD LCD
Refresh rate 60 Hz 50 Hz
Power supply External Internal
Guaranteed support 1 year –
Software updates 1 year –
Spare parts available 1 year –
On the market since May 1, 2024 September 4, 2024
EPREL registration number 1971941 2123108
Off mode – 0.1 W

Rows where the models differ are highlighted.